> showroom EPBS

The project is being developed in an industrial warehouse with a free height of more than 5 meters, which currently has inadequate visual conditions both on the roof and the floor to function as a showroom. The building's trusses are in an unknown state, potentially presenting issues with oxidation and structural integrity, which may affect their use as structural supports. The company is in its start-up phase and is considering a possible relocation in the medium term. The work surface in the warehouse is suitable for the current phase, although the location lacks street visibility.

The proposal suggests elevating the program where possible to free up the ground floor and allocate space for the production process. This includes utilizing the height of the warehouse and the option to suspend structures from the trusses. By elevating the program, an elevated view from the first level is achieved, providing better control of the production process, improved visibility for potential clients when showcasing the process, and increased prominence of the building upon entry.

The building is constructed using the product developed by the company, which will demonstrate the characteristics of the product (Prefabricated Structural Panel Construction System), such as its lightweight properties, the ability to reduce slab and wall thickness, and the variety of possible finishes.

The project is being developed in an industrial warehouse with a free height of more than 5 meters, which currently has inadequate visual conditions both on the roof and the floor to function as a showroom. The building's trusses are in an unknown state, potentially presenting issues with oxidation and structural integrity, which may affect their use as structural supports. The company is in its start-up phase and is considering a possible relocation in the medium term. The work surface in the warehouse is suitable for the current phase, although the location lacks street visibility.

The proposal suggests elevating the program where possible to free up the ground floor and allocate space for the production process. This includes utilizing the height of the warehouse and the option to suspend structures from the trusses. By elevating the program, an elevated view from the first level is achieved, providing better control of the production process, improved visibility for potential clients when showcasing the process, and increased prominence of the building upon entry.

The building is constructed using the product developed by the company, which will demonstrate the characteristics of the product (Prefabricated Structural Panel Construction System), such as its lightweight properties, the ability to reduce slab and wall thickness, and the variety of possible finishes.